SolarEdge 66.6kW Synergy Manager FUSE DC Switch, MC4, DC SPD, Fuses
Regular price
Couldn't load pickup availability
Solar Edge Synergy Manager:
- Contains communication board, AC and DC connection: no need to open the inverter units during installation.
- Reduced BoS with support for single DC input and cost-effective aluminium cables
- Separation of AC and DC connections
- Dimensions of Synergy Manager (H x W x D): 360 x 560 x 295mm
- Weight of Synergy Manager: 18kg
25Amp fuse is NOT compatible with the S1200 optimisers. 30Amp fuse (per phase) replacement is required for this inverter to work with the S1200 optimiser.